Fauna management plans

A site-specific plan for managing fauna through your works. We turn your approval conditions, site evidence and clearing program into practical controls and reporting requirements.
Send your site plans, approval conditions and existing surveys so we can scope your fauna management plan.
What we can help with
The scope is agreed for your site before work starts.
- Project footprint and approval requirements
- Desktop evidence and available survey findings
- Fauna risks, habitat features and breeding places
- Responsibilities, hold points and response procedures
A plan your site team can use.
Agree the records and reporting you need when we quote the work.
- Draft Fauna Management Plan for review
- Site maps and supporting evidence
- Agreed revisions and technical sign-off
- Final document with implementation requirements
Related plans and approvals
Species Management Programs, Koala Management Plans and fauna input to a combined flora and fauna plan can be scoped where relevant. Surveys, lodgement assistance, regulator responses and implementation are not automatically included. A plan does not itself authorise clearing.
Start with your site and approval conditions
An FMP is a scoped planning service, not an automatically priced field-crew booking. We review the available information, identify any evidence gaps and agree the work and price before preparation begins.
- Site location, project description and clearing footprint
- Development approval or environmental authority conditions, where available
- Existing ecological surveys, habitat assessments and management plans
- Proposed works, program dates, reviewer requirements and reporting expectations
What is a Fauna Management Plan?
An FMP is the document your approval conditions, environmental authority or principal contractor asks for before clearing starts. It explains which animals are likely on site, what habitat will be lost, and the controls you will follow before, during and after clearing so that fauna impacts are avoided, reduced and recorded.
A good FMP is specific to your footprint. Generic templates are a common reason plans are sent back for revision, because they do not match the species, habitat and work methods on the actual site.
What's included in our FMPs
The agreed scope determines the plan's coverage and supporting evidence. Depending on the site and approval requirements, the document can include:
- Project overview, footprint map and scope of works
- Legislative and approval context (state and federal)
- Desktop assessment of threatened and protected species
- Available field survey findings and habitat features such as hollows and nests
- Species profiles and habitat requirements
- Breeding-place assessment and management actions
- Controls for design, pre-clearing, clearing and post-clearing stages
- Fauna Spotter Catcher and Koala Spotter deployment
- Incident response, reporting and monitoring
- Roles, responsibilities and communication chain
How we prepare your plan
We start with a desktop review of protected matters and species records for your site, then design any field surveys needed to confirm what is really there. Survey results, site plans and your approval conditions feed straight into the plan, so every control traces back to evidence. You review a draft, we make your changes, and a qualified ecologist signs off the final version.
- Desktop assessment and species shortlist
- Field survey design and fauna surveys where required and included in the agreed scope
- Draft FMP for your review
- Final FMP with technical sign-off
Fauna management plans in every state
Each state and territory has its own wildlife legislation, approval pathway and reporting format, so the same project needs a different plan in Queensland than it does in New South Wales or Western Australia. We write each plan to the legislation and approval conditions that apply where your site sits, and where federal matters are triggered we address them in the same document.
Flora and fauna management plans
Some approvals ask for a single flora and fauna management plan. We prepare the fauna sections, including species, habitat, clearing controls and spotter catcher procedures, and work with your flora consultant so the combined plan reads as one consistent document.
Species Management Programs and breeding places
In Queensland, tampering with a protected animal breeding place usually needs an approved Species Management Program (SMP). Other states use different approval pathways. We include the breeding-place assessment and management actions within your FMP and prepare the supporting SMP material where Queensland requires it.
Koala Management Plans
Where your site sits inside mapped koala habitat, we can prepare a dedicated Koala Management Plan alongside the FMP and supply the Koala Spotters needed to carry it out on site.
A plan your crew can follow
Because we also supply the Fauna Spotter Catchers who work to these plans, our FMPs are written to be practical on site: clear hold points, simple stop-work triggers and records that match what the regulator expects to see. A plan supports your approval application but does not itself authorise clearing, so we flag any approvals you still need.
Agree the deliverables before work starts
Your proposal should identify the plan scope, required desktop and field evidence, draft review process and final document format. Confirm whether surveys, regulator correspondence, revisions or on-site implementation are included or separately scoped.
We can discuss related pre-clearance surveys and field support, but a plan does not itself approve clearing or replace any authority required for the project.
Scope and pricing
Send the site location, footprint, proposed dates and approval conditions. We agree the survey or planning scope, deliverables and price before work starts.
Permissions and mobilisation
We hold relevant company wildlife authorities in Queensland and South Australia. Elsewhere, the required permissions are arranged for the project. We confirm scope, crew availability and permissions before mobilisation; a quote or management plan is not approval to clear.
Frequently asked questions
How much does a fauna management plan cost?
We confirm the price after reviewing the footprint, conditions and available evidence. The proposal identifies any extra surveys, review rounds or specialist work.
How long will it take?
Timing depends on the information available, any field work and draft review requirements. Give us your target date when you enquire.
Can your crews carry out the plan?
Yes. Field implementation can be quoted separately, with the required personnel, permissions and reporting agreed before mobilisation.
When do I need a Fauna Management Plan?
Usually when your development approval, environmental authority or contract conditions require one before vegetation clearing, or when protected or threatened species are likely on site. Send us your conditions and we will confirm what the plan needs to cover.
Do you prepare FMPs outside Queensland?
Yes. We prepare Fauna Management Plans for projects in every Australian state and territory and align each plan to the local legislation and approval conditions.
Do you lodge the SMP for us?
SMP preparation, lodgement assistance and responses to regulator queries can be included in an agreed scope. Confirm these tasks and any additional evidence or revisions in the proposal. Lodgement requires your authorisation and does not guarantee approval.
Can I use a fauna management plan template?
A template can help organise information, but it cannot establish the site's habitat, fauna risks or approval requirements. The plan needs evidence and controls that match your project. Acceptance remains a decision for the relevant reviewer or authority.